Francusko-Polskie Przedsiębiorstwo Instalacji Przemysłowych  POLSNIG Sp. z o.o.

Industrial branch



© POLSNIG 2011

No.

Investor

Realized works

1.

Sanocki Zakład Górnictwa Nafty i Gazu

1992 - complex management of gas well on the Grabina - Nieznanowice deposit
(7 wellbores, 32 km of pipelines), Żukowice, Grobla, execution of pressurized lines of gas and reduction stations at the mine in Łąkta Górna, Poland
1993 - elaborate of project and execution of column of gas drying 6,4 MPa, assembly
of pumps and tanks with tubulation and assembly of meter system
1996-1999 - extension of gassy mine KGZ Tarnów I execution and assembly of 32 pices of apparatuses 6,4 MPa with tubulation - Tarnów, Poland
2000-2001 - modernization and extension at the mine of eatrh gas - Łakta 28 and management of gas well - Łakta 28, Poland

2.

Industrial Plant LAVERA
- France

1992 - assembly of 3 pcs. storage tanks for petrochemical products: D=25m, V=4000 m3

3.

Paper Factory (Limoges)
- France

1992 - assembly of fire-water installation in paper factory
1993 - assembly of installation of demineralizational water - stainless steel

4.

TC DĘBICA S.A.

1993-1995 - general repair: presses CHODOS 55, presses AUTOLOK, downcast ventilators, radiators of turbogenerator, principal exchanger ECI and repair feed of press CHODOS by heating steam and reconstruction of heating system of pressses and exchange pipes of boiler heater EC-II - Dębica, Poland
1997-1998 - execution of condensate steam installation, istallations for nitrogen industry, pipelines fo presses AUBO Z-2, connections of vulcanization presses AUTOLOK, assembly of steam separators with tubulation, conversion vulcanization presses BOM with connection and activate - Dębica, Poland
2004 - execution of 4 spool sets - Dębica, Poland

5.

Polifarb S.A.

1994 - execution of resin tanks of stainless steel - Dębica, Poland
1996 - execution of running ladles with cover of stainless steel - Dębica, Poland

6.

SOFREGAZ

1995 - repair works of high-pressurized of petroleum refinery - Skikda, Algeria

7.

RIENI DRINKS

1995 - assembly of power pipelines, unpressurized boiler-rooms - Romania

8.

LITWIN - Francja

1996 - prefabrication of pressure pipelines of carbon steel, refinery KOSTOWO, Russia

9.

COFATEC - France

1998 - execution of heating installation and air conditioning at store GEANT Kraków, CASINO, Poland

10.

CDR GROUPE SNIG
- France

1999 - realization of chemical industry equipment at the CDR, France
2001 - bearers for apparatuses of petrochemical industry - France

11.

SYMEX - Francja

1999-2000 -  execution and assembly of VRU installation for utilization of hydrocarbon vapours on unloading of liquid fuel for NAFTOPORT Sp. z o.o. in Gdańsk, Poland
2001-2002 - execution of 18 complete units VRU of recovery and utilization of hydrocarbon vapours during unloading of liquid fuel. These units were made for French investor and destined to customers in: Norway, Great Britain, Portugal, France with complete documentation made according to CODAP (French standards) and BS (British standards). These units were composed of 54 pressure apparatuses, France.
2003 - execution of 8 complete units VRU  (for recovery and utilization of hydrocarbon vapours during unloading of liquid fuel)with tubulation. These units were made for French Investor and destined to customers in: France,  Portugal, Estonia, Greece, Cyprus.
2004 - execution of 5 complete units VRU (for recovery and utilization of hydrocarbon vapours during unloading of liquid fuel) with tubulation. These units were made for French Investor and destined to customers in: Greece, Russia, Holland, England.

12.

SCHMALBACH - LUBECA

2000 - modernization of circulations: cooling water and compressed air, execution installation to pneumatic conveying of granulated products - Radomsko, Poland
2002 - technological extension of installations of cooling water and compressed air -
Radomsko, Poland

13.

ONDULINE PRODUCTION Sp. z o.o.

2000 - execution and assembly of equipment of production lines - Mielec, Poland
2001 - execution of shafts O 170 and O 140 with flanges - Mielec, Poland
2003 - modernization of installation of bitumen external tanks,
-
execution and assembly of air pipelines D 500, 355, 315 - material: carbon steel

14.

ABB ALSTOM - SNIG EST

2000 - execution and supply of pipelines elements for RADES II, Tunisia

15.

STILON S.A.

2000 - assembly of pipelines, execution of cable installation, assembly of installation of pneumatic conveying per length 750 m with assembly of silos and technological equipment - Gorzów Wielkopolski, Poland
2001 - execution of mobile vacuum units with filter plant, assembly of machines and technological devices with tubulation and execution of reservoirs of stainless steel at the new part of factory, within a framework of contract maintenance of movement and supervision for a 6 months with realization of repair - assembling works                            - Gorzów Wielkopolski, Poland
2002 - execution of full automatic unloading line for big-bag containers with line of pneumatic trnsport for raw granulate material
2003 - modernization of air washers No. 106, 108 - steam-, water installation and bracket construction
2009 - assembly of installation for pneumatic conveying - 3 pipelines
2010 - modernization of installation for pneumatic conveying

16.

KRONOWOOD Sp. z o.o.

/

KRONOSPAN MIELEC
Sp. z o.o.

2001 - realization of installation of high-temperature technological oil
- diameter DN 200 - 250 mm
- length 2,3 km trestle bridge with boosters
- execution of 2 pieces of evaporators with  surface of heat exchange 188 m2 each
and steam installation and condensate for division of defibering of arboreal mass
- realization and modernization of heating of production rooms on the  basic
of technological oil of total power 400 kW
- realization and connecting of the new installation of feeding mixer of resin IFA,
- execution of tanks with tubulation of acid resistant  steel on the division of defibering
of arboreal mass
- assembly of oil pumps and modification of feeding of oil boilers
- realization of major repair of heaters of technological air
- disassembly of technological water treatment plant and its adaptation for conditions
of Kronowood Mielec - output 28 m3/h, of acid resistant steel - Mielec, Poland
2002 - modernization of Kusters presses, 
- execution of bathtub of resin - 2 pieces
- execution of heating input of steam  generator,
- heater of air 2400 x 2400 mm,
- execution and assembly of acid-proof tanks V = 50 m3 -2 pcs. and V = 400 m3 -1 pcs.
2003 -
maintenance works on installations - in cycles,
- modernization of heating oil installation,
- execution of installation for filling of components for resin mixer,
- execution of tank of resin circulation,
- execution and assembly of air steam heater 12 bar,
- execution and assembly of return oil installation on the press,
- reconstruction of chip storage bin,
- segmentation of resin tank with additional tubulation,
- execution and assembly of oil-air heater with tubulation.
2004 - maintenance works on installations - in cycles weekly,
- execution and repair of heater system of technological air,
- execution and assembly stainless steel cooling reactor of adhesive, V = 17,6 m3, with construction, platform and tubulation - Mielec, Poland
2005 - maintenance works - cyclically

- execution of heating element of steam generator MDF,
- execution and assembly of heater oil-air,
- execution and repair of heaters system of technological air,
- execution of installation of supply of resins and components, from storage tanks to the IFA station
2006 -
maintenance works - cyclically
- installation of thermo-oil feeding of heaters of dryer MDF,
- adaptation of tank (before tank of kaurit) for storage resin LMX,
- execution and assembly of heater oil-air of dryer MDF
2007 -
maintenance works - cyclically,
- execution and assembly of thermo-oil installation,
- assembly of installation for pneumatic conveying of melamine,
- execution and assembly of air steam heater

17.

LYONDELL

2001 - realization of 480 tons  of izometrics and 120 tons of supports with heat treatment after welding in accordance with european standards and code of the Dutch Technical Inspection, Holland

18.

ALPHATRADE

2002 - execution of elements of bearing casings, Luxemburg

19.

KRONODOOR PL Sp. z .o.o
- Jasło

2002 - survey, repair and complementation of installations in production room, execution of station heating of production rom - Jasło, Poland
2007 - execution of the heat installation - Jasło, Poland

20.

KRONOERG Sp. z o.o.
- Pustków

2003 - execution of service platforms, ladders and exchange of fittings on the pressure apparatus of hot water.

21.

TZCB LEIER S.A.

2004 - execution of gas piping feeding the earth gas to the tunnel furnance No 2B - in accordance with Directive 97/23/EC,
- execution of gas piping feeding  the earth gas to drier No 2B and to mixing chamber 2B - in accordance with Directive 97/23/EC.

22.

Fabryka Farb i Lakierów
ŚNIEŻKA S.A.

2004 - modernization of storage tanks with UDT inspection, with capacity:
V = 50 m3 - 5 pcs., V = 32 m3 - 1 pcs., V = 23 m 3 - 2 pcs, for materials for production paint and lacquer,
- execution of piping installation of store part, and connection of new store installation with existing production installation,
- execution of stainless steel agitators for paints and lacquers - 21 pcs. - Brzeznica
2005 - execution of pipeline installation of solvent-paint department in processing
and auxiliary-power part
- execution and assembly of adsorption installation of solvent vapours
2006 - execution of the new stainless steel resin storage tanks with capacity:
V = 32 m3 - D 3000 x 6805 - 4 pcs. and V = 50 m3 - D 3000 x 9306 - 3 pcs.
- modernization of stainless steel resin storage tanks with capacity:
V = 43 m3 - D 2800 x 8425 - 3 pcs.
2007 - execution and assembly of pipeline installation with assembly of tanks in resin store
2008 - execution of pipeline installation of LORAMA paint

23.

LOTOS - Gdańsk

2004 - modernization of petrol station POL-MARK in Przeworsk, depending on: execution the second steel coat in two tanks two-chamber V = 72 m3 , and  in one tank one-chamber V = 50 m3, purchase and assembly of dry monitoring of intershell space, and assembly and modernization of all piping installations - Przeworsk, Poland.

24.

HADES - Piła

2004 - execution of 10 tons of bracket constructions under tanks, on department P2,
in Fabryka Farb i Lakierów ŚNIEŻKA S.A. (Paints and Lacquers Factory) in Brzeźnica.
2005 - execution app. 12 tons of bracket construction on the installation of solvent-paint in Fabryka Farb i Lakierów ŚNIEŻKA S.A. in Brzeźnica

25.

ATLAS COPCO

2004 - production of vessels of compressed air V = 3 m3 and V = 2 m3

26.

TEBODIN - Holland

2005 - execution of Vapour Recovery Unit for Terneuzen, Holland

27.

CARBOVAC - France

2005-2006 - execution of Vapour Recovery Unit for PRIMEX Company - UFA, Russia:
vessel D 3200 x 4000 - 2 pcs., D 1200 x 5320 - 1 pcs.
2007 - execution of Vapour Recovery Unit for BP Amsterdam, Holland:
vessel D 3800 x 4000 - 2pcs, D 1800 x 6000 - 1pcs.
- execution of Vapour Recovery Unit for Q8 Napoli, Italy:
vessel D 4000 x 3750 - 2 pcs, D 1200 x 6000 - 1pcs.
2008 - execution of Vapour Recovery Unit for BP Amsterdam Kyoto, Holland:
vessel D 3800 x 4000 - 6 pcs., D 3000 x 6000 - 1 pcs.
2009 - execution of Vapour Recovery Unit for EUROTANK Amsterdam, Holland:
vessel D 3800 x 4000 - 4 pcs., D 3000 x 6000 - 1 pcs.
- execution of Vapour Recovery Unit for EUROTANK Amsterdam, Holland:
vessel D 3800 x 4000 - 2 pcs., D 2400 x 6000 - 1 pcs.
- execution of Vapour Recovery Unit for OilTanking Amsterdam, Holland:
vessel D 3800 x 4000 - 6 pcs., D 3000 x 6000 - 1 pcs.
- execution of Vapour Recovery Unit for TOTAL Mayotte (Madagascar):
vessel D 1600 x 2000 - 2 pcs., D 500/300 x 4500 - 1 pcs.
- execution of Vapour Recovery Unit for  Kirischi, Russia:
vessel D 3400 x 4000 - 6 pcs., D 3000 x 6000 - 1 pcs.
- execution of Vapour Recovery Unit for NESTE OIL Rotterdam,
Holland:
vessel D 3400 x 4000 - 6 pcs., D 1400 x 6000 - 1 pcs.
2010 -
execution of Vapour Recovery Unit I for VOPAK Westpoort Amsterdam, Holland:
vessel D 3800 x 4000 - 6 pcs., D 3000 x 6000 - 1 pcs.
- execution of Vapour Recovery Unit II for VOPAK Westpoort Amsterdam, Holland:
vessel D 3800 x 4000 - 4 pcs., D 2400 x 6000 - 1 pcs.

28.

VENTAMONJAKS - Latvia

2006 - execution of Vapour Recovery Unit for VENTAMONJAKS Company Ventspils, Latvia: vessel D 3800 x 4000 - 4 pcs., D 2200 x 6000 - 1 pcs.

29.

HPL Pustków Sp. z o.o.

2006 - execution and assembly of pipeline installation with assembly of tanks in resin store,
- execution of round-the-clock store for containers of components for resins,
-
execution and assembly of pipelines of fire-water DN80
2007 - execution and assembly of refrigeration plant,
- execution and assembly of heating and cooling system for BVH press machine,  - execution and assembly of heating instalation of plant,
2008 - execution and assembly of pipelines of heating oil for HYMMEN press machine.
- execution of pipelines for the Fjelmans press,
- exchange of heating shelfs of the Fjelmans press
2009 - execution of the ice water installation

30.

P.R.M. GETREM Sp. z o.o.
- Dębica

2007 - production of whiting mixer V = 7,85 m3 - D 2100 x 3300 - 1 pcs.,
V = 2,85 m3 - D 1300 x 3300 - 1 pcs.
2008 - execution and assembly of steam and condensate piping installations for GoodYear   Dębica

31.

PRITIP COMPAGNIE
- Puławy

2008 - prefabrication and assembly of piping installations for Saint-Gobain, Dabrowa Górnicza

32.

ELSTAL AB - Sweden

2007 - execution and assembly of external pipelines for boiler plant in Kristianstad,      Sweden
2008 - execution and assembly of external pipelines for boiler plant in Kalmar, Sweden
2009 - execution and assembly of external pipelines for boiler plant in Biganos, France

33.

Dimet-ZBA Sp. z o.o.
- Kędzierzyn-Kozle

2010 - production of the steel constructions (10 tons) to Głogów,
- execution of hood suction of the graphitizating furnace to Racibórz

34.

POLIMEX-MOSTOSTAL
/ NAFTOBUDOWA S.A.
/ MONTONAFT Jedlicze

2010 - production of the steel constructions and platforms,
- execution of the sprinkler installation,
- execution of the panels of modules convection

POLSNIG  Sp. z o.o.   |   PL 33-101 Tarnów, ul. Kwiatkowskiego 8   |   T.: +48 14 633 13 33,  F.: +48 14 679 23 99   |   e-mail: polsnig@polsnig.pl    |   www.polsnig.pl