No.

Investor

Realized works

1.

Browar "OKOCIM" S.A.

1992 - realization and assembly of beer reserviors - Kraków, Poland
1995 - realization and assembly of fermentation tank - Kraków, Poland
1996 - realization and assembly of beer reservior - Brzesko, Poland
2000 - realization of tanks of yeast slurry - Brzesko, Poland

2.

TYMBARK S.A.

1993 - realization and assembly of tanks of fruit-must - Tymbark, Poland

3.

NESTLE Polska Sp. z o.o.

1994 - assembly of technological installation (yoghurt, milk, sour cream, cheese), assembly of instalation of cleaning CIP (Clean-in-Place), assembly of store reservoirs of sour cream - Słupsk, Poland
1995 - assembly of packing installation Nescafe, assembly of installation of powdered soup production, realization and assembly of equipment of fat fusion, realization and assembly of exchangers and reservoirs - Winiary, Poland
1997 - realization and assembly of 2 exchangers of yoghurt and kefir, modernization
of productive installation of powdered milk - Słupsk, Poland
1999 - modernization of milk installation - Słupsk, Poland
2000 - modernization of installation of milk and yoghurt, assembly of machine to packing
of yoghurt, realization of installation to  flavouring NESCAFÉ - Słupsk, Poland

4.

DANONE Sp. z o.o.

1994 - realization and assembly of agitators for reservoirs - Warszawa, Poland
1995-1996 - modernization of installation of milk and yoghurt, realization and assembly
of agitators - Bieruń, Poland
1997 - modernization of installation CIP, assembly of reservoirs of liquor and acid - Warszawa, Poland
1998 - modernization of dairying installation - Warszawa, Poland
1999 - modernization of installation of production of yoghurt and sour cream - Bieruń, Poland

5.

BAKOMA S.A.

1996 - assembly of installation of production of yoghurt, assembly of machines of jogurt packing with washing station, assembly of installation of washing CIP- Elżbietów, Poland
1998 - assembly of productive installation of volume of fruit for yoghurt production - Elbietów, Poland
1999 - assembly of installation of production line of pudding, assembly of pipelines  feeding reservoirs of sour cream - Elżbietów, Poland
2000 - expansion of installation of puddingu, welding and assembling works on the production line QUARK, installation of packing  machine ELOPAK, realization and assembly of construction for packing machine HAMBA 8008 - Elżbietów, Poland

6.

YOPLAIT Polska Sp. z o.o.

1997 - assembly of productive installation of yoghurt and sour cream - Osowa Sień, Poland
1999 - assembly of packing machine, assembly of fermenting tanks - Osowa Sień, Poland

7.

HOOP S.A.

2000 - assembling and welding works on the production line of drinks                                - Bielsk Podlaski, Poland

8.

OSM GARWOLIN

2001 - realization and assembly of indirect reservoirs of milk standardization, modernization and expansion of technological lines, realization of power line and CIP         - Garwolin, Poland
2003 - transfer of machines LPC-4 and PGK-1 on the installation of kefir and sour cream

9.

SM SPOMLEK

2002 - assembling works - Radzyń Podlaski, Poland
2003 - assembly and welding works - Radzyń Podlaski, Poland
2004 - assembly and welding works - Radzyń Podlaski, Poland

10.

ELOPAK S.A.

2002 - building, assembly and starting of production line of polyethylene package     (bottles 0,25l,  0,5l and  1l)
- execution of storage silo, pneumatic conveying, compressed air installation and modernization of production room - Czosnów, Poland
2003 -
assembly and welding works - Czosnów, Poland.

11.

ZPH JANTOŃ

2002 - execution of 15 pieces fermenting tanks of wine V = 200 m3, of stainless steel, with completed equipment and with procedure of type approval by Główny Urząd Miar
in Warszawa - Dobroń,  Poland
2003 - execution of 3 pcs. spirit  tanks, in according to the requirements of regulations concerning liquid-inflammable materials
- tanks of dumping water V = 50 m3 - 2 pcs. - mat. SS
- tanks of liquid sugar V = 6 m3 - 4 pcs. - mat. SS

12.

BIOGRAN GmbH Sp. z o.o.

2003 - building and assembly of technological installation, washing installation and CIP station - for storage and treatment of coffee fluid extract.
-  execution and assembly of technological installation and CIP - for vacuum evaporator and separator GEA,
- elaboration a technology and execution of wash installation and CIP station for above  objects
2004 - building and assembly of technological installation, wash installation and CIP station for storage and treatment of coffee fluid extract - stage 2.
- execution and  assembly of technological installation and CIP for 2 pcs. vacuum evaporator and centrifuge GEA.
2005 - execution and assembly technological pipelines and washing pipelines
of installation of dewatering of dregs with tubulation of decanter (stage 1)
2006 - execution and assembly technological pipelines and washing pipelines
of installation of dewatering of dregs with tubulation of decanter (stage 2)
2010 - execution and assembly of the installations of juices transmissions and CIP

13.

PURM AG-RO - Szczerców

2003 - tank of technological water V = 75 m3 - carbon steel,
- tank of technological water V = 50 m3 - stainless steel

14.

OVOVITA
- Prawda, near Lodz

2003-2004 - assembly of technological lines for fresh eggs processing, execution of operate tanks and CIP station
- execution of power installations with boiler-room
2003-2004 - assembly of processing line to fresh eggs processing, on the basis of process engineering of French company ACTINI PROCESSING, with capacity 60 000 eggs per hour, with execution of operation tank: 3 x 14 m 3 + 1 x 10 m3 and CIP station (two-lines)
- assembly of pasteurization line with use of pasteurizer ACTI-FLASH - with unique method of heating up of medium in tubular spaces with the help of electric energy
2005-2006 - execution of project and realization of preservation of energy medium:
- boiler-room oil-carbon - 3,2 MW
- refrigerated central with installation - 500 kW
- compressed air - 2 x 330 m3 per hour
- installation of central heating - 600 kW and hot technological water - 12 m3 per hour
->execution and assembly of processing line to production the powder of white, yolk and whole egg, on the basis of process engineering of Danish company SANOVO, with capacity 70 000 eggs per hour:
- assembly of horizontal dryers for white, yolk and whole egg
- ultrafiltration installation
- execution of operation tanks 4 x 14 m3
-
execution of fermenters of white 2 x 14 m3

POLSNIG  Sp. z o.o.   |   PL 33-101 Tarnów, ul. Kwiatkowskiego 8   |   T.: +48 14 633 13 33,  F.: +48 14 679 23 99   |   e-mail: polsnig@polsnig.pl    |   www.polsnig.pl